Technical integration

Interfaces, data formats and acceptance criteria settled before the first machine arrives. We guide your departments and the partner through delivery.

The award is the easy part. Between the order and a running line lie handovers nobody owns alone: mechanics against controls, controls against MES, MES against ERP.

We settle those interfaces before the first machine arrives and set measurable acceptance criteria while they are still negotiable. After delivery, every discussion about criteria is a discussion about a variation.

During delivery there is one point of contact on our side and an escalation path that is named before it is needed.

1
Point of contact across all trades
upfront
Acceptance criteria measurably defined

Outcomes

What you actually receive

Every point is a deliverable, not a promise. It is scheduled at project start and signed off at completion.

  • Interface and data concept across mechanics, controls and IT
  • Measurable acceptance criteria with the matching inspection plan
  • Requirement and functional specifications as part of the contract
  • Coordination between the department, IT and the partner
  • Documented commissioning including test records
  • Training records for operating and maintenance staff

Approach

How Technical integration runs

A fixed approach does not mean every project runs the same way — it means you know at any point what happens next and who is accountable for it.

  1. 01

    Clarify interfaces

    Mechanics, controls and IT are considered together rather than one after another — including the question of which system is the source of record in a conflict.

  2. 02

    Define acceptance criteria

    Measurable criteria before the project starts prevent arguments at acceptance. Every criterion gets a test method and a threshold, not an adjective.

  3. 03

    Support delivery

    Regular meetings, a named escalation path and a single point of contact on our side — even when four trades are on the floor at once.

  4. 04

    Document the handover

    Complete documentation including test records, spare parts list and training records, handed to operations and maintenance.