Skip to content

Production

Layout, material flow and room to grow

Factory planning

Concept and detailed planning of production space — from the block layout through material flow simulation to utilities and connection planning. We plan the space for the operation in five years, not for today's order book.

3 scen.
Layout variants assessed
5 yrs
Planning horizon

What you have in hand at the end

Not a status report but delivered work results — decided, documented, and with someone accountable for each.

5

work results handed over, each with a named owner and a date.

  • Capacity and floor-space calculation per scenario
  • Block layout and detailed layout with a material flow assessment
  • Process simulation of the critical areas
  • Utilities, load and connection planning as a basis for tendering
  • Relocation and ramp-up plan with downtime windows

Talk to our team directly

Prefer to speak to someone? Arrange a first conversation, without obligation, with one of the people responsible for your sector.

Submit a request