Prevent defects instead of sorting them out
Quality planning
Preventive quality planning along APQP: risks are assessed during design, inspection characteristics are derived from function, and gauges are made capable before the series starts. Quality effort shifts from the rework bench into the planning.
- IATF
- Audit-ready to 16949
- 2 wks
- To an approved inspection plan
What you have in hand at the end
Not a status report but delivered work results — decided, documented, and with someone accountable for each.
5
work results handed over, each with a named owner and a date.
- Process FMEA with assessed actions and deadlines
- Inspection plan with characteristic classes and sampling strategy
- Gauge capability evidence (cg, cgk) and measuring equipment plan
- First-article sampling to VDA 2 or PPAP Level 3
- Complaints process with an 8D template and effectiveness check
Providers who deliver this module
We plan and support; delivery is by checked companies from the marketplace. We take no commission from the provider side for it.
Quality & Metrology
Metrology-room services, first-article sampling and gauge management to IATF 16949 and ISO 9001.
Manufacturing & Machining
Machining from single-part sampling through to series production. Partners in this category evidence their machine park, their tolerance classes and their gauge capability.
Engineering & Design
External design offices for machinery and fixtures, FEA calculation and technical documentation. What is designed here is a known principle; where the principle itself is still open, the work begins in “Research & Development”.
Production
Often commissioned together
Further modules in Production that follow on from this one — with the metrics each of them moves.
Business processes
Understand first, then streamline
- Analysis period
- 4–6 wks
- Processes documented
- in full
Assessing AI use cases
Use cases with a data basis, not with slides
- To a proof of concept that holds
- 8 wks
- Processing exclusively
- EU
Factory planning
Layout, material flow and room to grow
- Layout variants assessed
- 3 scen.
- Planning horizon
- 5 yrs
Talk to our team directly
Prefer to speak to someone? Arrange a first conversation, without obligation, with one of the people responsible for your sector.