Use cases with a data basis, not with slides
Assessing AI use cases
We examine which manufacturing problems can be solved economically with machine learning — scrap prediction, remaining-life estimation, visual inspection — and which cannot. Every use case is validated against real plant data before anything is invested.
- 8 wks
- To a proof of concept that holds
- EU
- Processing exclusively
Announced category on this subject:
AI in ProductionComing SoonWhat you have in hand at the end
Not a status report but delivered work results — decided, documented, and with someone accountable for each.
5
work results handed over, each with a named owner and a date.
- Data-readiness assessment per machine and process step
- Assessed list of possible use cases with a cost-benefit estimate
- Proof of concept on historical production data
- Data protection and data sovereignty concept under Art. 35 GDPR
- Operating concept: who maintains, monitors and owns the model
Providers who deliver this module
We plan and support; delivery is by checked companies from the marketplace. We take no commission from the provider side for it.
Industrial Software
Software partners for production control, machine data capture and integration at the line — with workable answers on data sovereignty and data protection. The company's software beyond the machine — ERP, network, workstation — sits in “IT & Software Solutions”.
Automation & Robotics
Planning and building automated production cells — from the feasibility study through robot simulation to commissioning on the line.
Quality & Metrology
Metrology-room services, first-article sampling and gauge management to IATF 16949 and ISO 9001.
Production
Often commissioned together
Further modules in Production that follow on from this one — with the metrics each of them moves.
Business processes
Understand first, then streamline
- Analysis period
- 4–6 wks
- Processes documented
- in full
Quality planning
Prevent defects instead of sorting them out
- Audit-ready to 16949
- IATF
- To an approved inspection plan
- 2 wks
Factory planning
Layout, material flow and room to grow
- Layout variants assessed
- 3 scen.
- Planning horizon
- 5 yrs
Talk to our team directly
Prefer to speak to someone? Arrange a first conversation, without obligation, with one of the people responsible for your sector.