Understand first, then streamline
Business processes
We record the process landscape from order intake to delivery, make waiting and idle time visible, and define a target process that works without special cases. The result is not a recommendation but an agreed process map with owners.
- 4–6 wks
- Analysis period
- in full
- Processes documented
What you have in hand at the end
Not a status report but delivered work results — decided, documented, and with someone accountable for each.
5
work results handed over, each with a named owner and a date.
- Value stream analysis of the current state, including idle and changeover times
- Process map with roles, approvals and system boundaries
- Metric definitions (OTD, OEE, first-pass yield) with a data source per metric
- Action plan, prioritised by effect and effort
- Training material for the areas affected
Providers who deliver this module
We plan and support; delivery is by checked companies from the marketplace. We take no commission from the provider side for it.
Industrial Software
Software partners for production control, machine data capture and integration at the line — with workable answers on data sovereignty and data protection. The company's software beyond the machine — ERP, network, workstation — sits in “IT & Software Solutions”.
Engineering & Design
External design offices for machinery and fixtures, FEA calculation and technical documentation. What is designed here is a known principle; where the principle itself is still open, the work begins in “Research & Development”.
Quality & Metrology
Metrology-room services, first-article sampling and gauge management to IATF 16949 and ISO 9001.
Production
Often commissioned together
Further modules in Production that follow on from this one — with the metrics each of them moves.
Assessing AI use cases
Use cases with a data basis, not with slides
- To a proof of concept that holds
- 8 wks
- Processing exclusively
- EU
Quality planning
Prevent defects instead of sorting them out
- Audit-ready to 16949
- IATF
- To an approved inspection plan
- 2 wks
Factory planning
Layout, material flow and room to grow
- Layout variants assessed
- 3 scen.
- Planning horizon
- 5 yrs
Talk to our team directly
Prefer to speak to someone? Arrange a first conversation, without obligation, with one of the people responsible for your sector.