One bill of materials, one truth
PLM & product data
Keeping product data consistent across development, manufacturing and service: BOM logic, change control and release processes are set up so that design and manufacturing see the same version.
- 1
- System of record per data object
- 12 wks
- Typical rollout period
What you have in hand at the end
Not a status report but delivered work results — decided, documented, and with someone accountable for each.
5
work results handed over, each with a named owner and a date.
- Data model for articles, variants and bills of materials
- Change and release process with roles and deadlines
- Migration concept for legacy data, including cleansing rules
- Interface specification to ERP, MES and CAD
- Roles and permissions concept under Art. 32 GDPR
Providers who deliver this module
We plan and support; delivery is by checked companies from the marketplace. We take no commission from the provider side for it.
Industrial Software
Software partners for production control, machine data capture and integration at the line — with workable answers on data sovereignty and data protection. The company's software beyond the machine — ERP, network, workstation — sits in “IT & Software Solutions”.
Engineering & Design
External design offices for machinery and fixtures, FEA calculation and technical documentation. What is designed here is a known principle; where the principle itself is still open, the work begins in “Research & Development”.
Manufacturing & Machining
Machining from single-part sampling through to series production. Partners in this category evidence their machine park, their tolerance classes and their gauge capability.
Production
Often commissioned together
Further modules in Production that follow on from this one — with the metrics each of them moves.
Business processes
Understand first, then streamline
- Analysis period
- 4–6 wks
- Processes documented
- in full
Assessing AI use cases
Use cases with a data basis, not with slides
- To a proof of concept that holds
- 8 wks
- Processing exclusively
- EU
Quality planning
Prevent defects instead of sorting them out
- Audit-ready to 16949
- IATF
- To an approved inspection plan
- 2 wks
Talk to our team directly
Prefer to speak to someone? Arrange a first conversation, without obligation, with one of the people responsible for your sector.